Process

How a China launch actually runs.

Ten phases, four filings, two platforms, six Android stores. The order matters more than the effort — several of these can run at once, and one of them sets the floor for everything else.

Typical elapsed time: 3–5 months for iOS or Android. Not six weeks — anybody quoting six weeks has not counted the filings.

3–5 monthsRealistic elapsed time from decision to live listing
60–90 daysSoftware copyright — the hard floor, not compressible
7–20 daysICP filing, once the entity and paperwork are clean
7 platformsApp Store China plus six major Android stores
Part one

Prerequisites and filings — mostly serial, mostly before anything else.

Phases 01 to 05 are the part that cannot be parallelised away. Do these late and everything downstream moves with them.

Phase 01

Readiness check

Twenty minutes, no cost. Category, build, entity situation. We tell you if it is viable before you spend anything — including when the answer is no.

Phase 02

Entity

You register or designate the Chinese entity that will hold the accounts, the filings and the copyright. This is yours, always — we advise and coordinate, and we never hold an entity on a client's behalf.

Phase 03

Software copyright

Applied for first, because it is the longest single item and several filings reference it.

Critical path · 60–90 days
Phase 04

ICP filing

Website and app content filed through the hosting provider: 7–20 business days. Needs the entity, a China-hosted server and a compliant site with a privacy policy.

Phase 05

Public security filing

Due within 30 days of ICP approval. It is a small piece of paperwork that quietly blocks store submissions when it is missed.

Mini Programs file separately again, and some categories need a qualification certificate before the filing is accepted at all. That check happens on the first call, not after you have paid for anything.
Part two

Adaptation, accounts and submission — this is where it starts to overlap.

Adaptation can run while the filings queue. Developer accounts can be opened while adaptation runs. Only the submission itself has to wait for everything.

Phase 06

China-readiness adaptation

We produce the plan — what breaks, what replaces it, in which order — and your developers implement it. We review the result against every review gate the stores apply.

Phase 07

Developer accounts

Corporate accounts on each store, with the identity and qualification paperwork each one wants. Six stores means six queues and six sets of requirements.

Phase 08

App filing

The app itself files with MIIT, separately from the website. No filing, no submission slot.

Phase 09

Submission

Every artefact prepared and submitted on your behalf, each review tracked individually — the App Store and six Android stores do not move at the same speed.

Where most rejections happen
Phase 10

Remediation and version iterations

Rejections diagnosed and resubmitted until they clear, included in the fee. Version updates go back through the same queues — the filing work is done once, the review work is not.

Overlapped

The same project, showing what can run at the same time.

This is the honest version of the timeline. Software copyright sets the floor; everything else is fitted around it.

Twenty weeks, typical 3–5 months
Entityclient-side Registration or designation
Software copyrightthe gate 60–90 days
ICP + public securitythen 30 days ICP 7–20 days → PSB filing
Adaptationyour developers 3–8 weeks, overlapped
App filingthen accounts MIIT app filing → developer accounts
Submissions7 platforms App Store + six Android stores
Remediationincluded Rejections → resubmission → live
Week 0Week 5Week 10Week 15Week 20
The four filings

Four registrations, four numbers, one mistake people make.

Almost everyone assumes ICP filing is the whole story. It is the first of four, and each one has to be displayed correctly in the right place.

01

ICP filing

Filed through your hosting provider in mainland China. 7–20 business days when the paperwork is clean. Everything else waits on this one.

Website and app content
02

Public security filing

A separate registration with the local public security bureau, due within 30 days of ICP approval. Missing it is one of the most common self-inflicted delays.

Within 30 days of ICP
03

App filing

The app itself needs its own filing, separate from the website. Stores will not open a submission slot without it.

MIIT, per app
04

Mini Program filing

WeChat Mini Programs file separately again, and some categories need a qualification certificate before the filing is accepted.

Only if you ship one
From you

What we need, and when we need it.

Most delays in a China launch are not caused by the filings. They are caused by an input that arrived three weeks late.

Before we start

Corporate

  • The entity — registered, or a decision to register one. Including who the legal representative will be.
  • Business licence and the contact who can sign filings.
  • Company stamps where the store or the filing authority requires a sealed document.
  • A China-hosted server if the filing route needs one — we advise on the minimum that satisfies the provider.
Before submission

Product

  • Your app build with the adaptation done, or a decision to have us build for China instead.
  • Privacy policy and user agreement, in Chinese, covering what your app actually collects.
  • Account deletion path and a data-export route — both are review gates now, not optional extras.
  • Store assets: name, description, screenshots, category, age rating.
  • Category certificates if your category needs one. This is the single most common cause of a late stop.
Reality check

Where projects actually slip.

Cause 01

The entity is not ready

Nothing can be filed without it: not the copyright, not ICP, not a single developer account. Every week the entity waits is a week added to the end of the project, because it is the first domino.

Cause 02

Software copyright started late

Sixty to ninety days is not a queue you can pay to skip. Teams that treat it as a formality to do "after the build" routinely lose two months doing nothing but waiting.

Cause 03

The build is not China-ready

Google dependencies, a missing account-deletion path, permissions the app asks for but never uses, a privacy policy that does not match the code. These are the rejections we see most, and all of them are avoidable before the first submission.

Next step

Find out which of these applies to you.

A 20-minute call and a written readiness check: your category, your filings, your critical path, and the things that would have cost you a month. If it is not viable, you will know on the call.

Prefer to talk it through? — usually answered the same day.